澳门银河赌场注册送38-澳门银河赌场招人好招吗_百家乐德州_全讯网下载 (中国)·官方网站

Ph.D. Programs

Petroleum and Natural Gas Engineering(Oil-Gas Well Drilling Engineering)

Program Introduction

Oil and gas wells are physical and informational conduits in the exploration and development of underground oil and gas resources. This major is aimed at investigating the knowledge related to the construction (drilling and completion), measurement, usage and maintenance of wells.

Program Overview

Core Courses:Advanced Numerical Analysis, Recent Progresses in Oil/Gas Well Engineering, Computational Solid Mechanics, Computational Fluid Mechanics

Teaching Languages:Chinese, English

Tuition:36000 RMB/Year

Course Start Date:September

Course Duration:Four Years

Application Deadline:May 30th

Research Areas

Oil and Gas Well Fluid Mechanics and Engineering

Oil and Gas Well Chemistry and Engineering

Oil and Gas Well Mechanics and Control Engineering

Oil and Gas Well Rock Mechanics and Engineering

Requirements

Application Requirements:
?1. Not a citizen of The Peoples Republic of China,?in good health and No Criminal Record.
?2. GPA≧3.0/5.0
?3. Chinese taught programs: HSK 5 (180 or above)
?English taught programs: IELTS≧6.5 or TOEFL≧80 points or TOEFL Essentials≥9, (DI Code: C806) for non native speakers of English.
?A certificate which can prove you have been taught in English during your previous study for more than two years is also acceptable.

Application Materials:
?1. Scanned copies of all China visa pages and China entry and exit record pages
?2. Notarized copies of your Highest level Degree certificates and transcripts
3. Soft copy of passport photo with white background, photo size 480x720, JPG format ?
4. Non criminal record
?5. Physical Examination Form (With all laboratory and X-ray reports) taken not?more than?six months prior to admission
?6. Study plan (Proposal) &CV
?7. 2 Recommendation letters ?(From an associate professor and above, Or Senior Professional in your field of study for postgraduate students)
?8. Acceptance letter from your supervisor
?9. HSK or IELTS/TOEFL

Petroleum and Natural Gas Engineering (Oil-Gas Well Drilling Engineering) -- Basic Information

Petroleum and Natural Gas Engineering (Oil-Gas Well Drilling Engineering) -- Application Guide

APPLY NOW

院子围墙砌18还是24| 盐城百家乐官网的玩法技巧和规则 | 金宝博娱乐城返水| 爱婴百家乐官网的玩法技巧和规则| 大发888在线官方| 闲和庄百家乐官网娱乐场| 缅甸百家乐赌场娱乐网规则| 御金娱乐城| 永利百家乐娱乐网| 博乐百家乐官网游戏| 百家乐如何投注法| 景泰县| 百家乐官网赌场走势图| 澳门百家乐规| 百人百家乐官网软件供应| 澳门百家乐娱乐网| 菲律宾百家乐官网赌场娱乐网规则 | 泸州市| 大发888下载删除| 信誉百家乐平台| 百家乐官网客户端下载| 菲律宾太阳城网| 网上百家乐打牌| 澳门百家乐娱乐城网址| 3U百家乐官网娱乐城| 大发888国际娱乐平台| 真人百家乐赌博技巧| 大东方百家乐官网游戏| 游艇会百家乐的玩法技巧和规则 | 威尼斯人娱乐城是波音| 米其林百家乐官网的玩法技巧和规则 | 四方百家乐官网的玩法技巧和规则| 赌场风云国语| 大发888 赌博网站| 百家乐翻天片尾曲| 最新百家乐游戏机| 网上百家乐官网公司| 百家乐官网网站出售| 黄金城百家乐游戏| 百家乐官网最新分析仪| 大发888娱乐城客服|